STATION
Production test engineering, automated

Schematic in. Test station out.

We turn your design files into a complete production test station — test program, fixture, operator UI and data pipeline — in days instead of months.

Loom walkthrough — embed pending
2–4 weeks
Test program development
moderately complex board
2–3 weeks
Fixture fabrication
design, machine, assemble
6–8 weeks
End to end
when firmware validation is involved

Source: FixturFab, industry test development benchmarks

What you get

Five outputs, one pipeline

Test Plan

Every rail, signal, and interface mapped to a limit — with the datasheet section and reasoning cited for each one.

Test Plan screenshot
Test Program

A runnable, engineer-reviewable test program with provenance inlined as documentation, not a black box.

Test Program screenshot
Fixture

Real probe-plate geometry traced from your layout — mechanical drawing, BOM, and wiring diagram to build it.

Fixture screenshot
Operator UI

A production-floor pass/fail station your operators can run on day one, no test-engineering background required.

Operator UI screenshot
Data Pipeline

Every unit's results captured automatically — yield, trends, and failure clustering from the first run.

Data Pipeline screenshot
Why us
I spent five years as a test engineer building fixtures and test programs by hand — reading the same schematics, deriving the same limits, wiring the same pogo pins, board after board. Station is the tool I wish I'd had on day one: it does in hours what used to take me weeks, without cutting the corners a shortcut usually forces you to cut.

We're taking on two design partners this quarter.

Book a call or send us a note — either works.

Cal.com embed — pending